Assistant Manager Operations and Service | Ex Maintenance Engineer Gadoon Power Plant | Expertise in Maintenance, Operations, Planning and Projects | Primavera P6 | Microsoft Project
Wartsila W16V34SG - 12000 hrs Maintenance 🛠️
Recently our team and Wärtsilä team completed the 12000 routine maintenance on Wartsila engine.
Scope of Work:
Turbocharger
✔ Removal and disassembly of both turbochargers and inspection of parts
✔ Cleaning of turbocharger parts
✔ Bearing kits were replaced for both compressor and turbine end
✔ Oil lip seal and all bolts were replaced
✔ Assembling and installation of turbocharger
Lube oil Automatic Backwash Filter
✔ Lube oil replacement and sump cleaning
✔ Lube oil filter candles were replaced
12K Maintenance Activities
✔ Tappet valve clearances were adjusted
✔ Differential pressure measurement over Charge Air Cooler
✔ Checked the function and I/P converter calibration of wastegate and air bypass valve
✔ Inspection of HT water spaces
✔ Contact faces of camshaft and tappet rollers were checked
✔ Exhaust manifold inspection for leaks and loose or broken supports
✔ Safety devices were tested
#Wartsila #Overhaul #Engine #EngineRebuild #Maintenance #RoutineOperations #Reliability #TeamWork